Thursday, January 16, 2014

Jaypee Greeens Castille 3 Greater Noida

Jaypee Greens The Castille ‐ III Greater Noida

jaypee greens castille 3
JAYPEE CASTILLE III GREATER NOIDA

THE CASTILLE 3 GREATER NOIDA


The Castille  III
PRODUCT BRIEF
Location:
Jaypee Green, G.Noida
Brief details of Project The Castile:
The Castille‐III is a low‐rise real estate development with a total of Only 48 apartment, product mix of
3 BHK and 4 BHK spread in 6 towers. The vision behind these residential towers is to offer
exceptional apartment layouts, clean design and large expansive windows that offer an un‐ending
view of the 18‐hole Greg Norman Signature golf course for the residents to savor. The
membership (optional) for the Club at the Town Centre shall be available for the residents of these
apartments on payment basis.
Areas:
Unit Type
Super Area
                                            InSq.M                                                                                   InSq.Ft
3BHK + Servant                  217.40                                                                                     2340
4BHK + Servant                  292.64                                                                                     3150
Height: Stilt + 4 Floors
Possession: 36 months plus grace period of 3 months
Master Plan:-
the castile master plan,the castille 3 layout plan

TYPICAL CLUSTER PLAN (CONCEPT) (Tower No. 14 & 16)
4BHK+SERVANT – 292.64 sq.mtr (3150 sq.ft.)
Note: The Super Area of the apartment as mentioned above is based on concept plans. Certain variations
are expected during the process of design & development from concept stage to Good for construction
stage. Final area will be recomputed based on “As Built” plans
UNIT ‐1
UNIT ‐2
7
25‐Dec‐13 The Castille ‐ III
UNIT PLAN (CONCEPT)
4BHK+SERVANT – 292.64 sq.mtr (3150 sq.ft.)
Note: The Super Area of the apartment as mentioned above is based on concept plans. Certain variations
are expected during the process of design & development from concept stage to Good for construction
stage. Final area will be recomputed based on “As Built” plans
UNIT ‐1
8
25‐Dec‐13 The Castille ‐ III
UNIT PLAN (CONCEPT)
4BHK+SERVANT – 292.64 sq.mtr (3150 sq.ft.)
Note: The Super Area of the apartment as mentioned above is based on concept plans. Certain variations
are expected during the process of design & development from concept stage to Good for construction
stage. Final area will be recomputed based on “As Built” plans
UNIT ‐2
9
25‐Dec‐13 The Castille ‐ III
4BHK RESERVE PARKING SLOT PLAN (CONCEPT) (Tower No. 14 & 16)
10
25‐Dec‐13 The Castille ‐ III
TYPICAL CLUSTER PLAN (CONCEPT) (Tower No. 15)
3BHK+SERVANT – 217.40 sq.mtr (2340 sq.ft.)
Note: The Super Area of the apartment as mentioned above is based on concept plans. Certain variations
are expected during the process of design & development from concept stage to Good for construction
stage. Final area will be recomputed based on “As Built” plans
UNIT ‐2
UNIT ‐1
11
25‐Dec‐13 The Castille ‐ III
UNIT PLAN (CONCEPT)
3BHK+SERVANT – 217.40 sq.mtr (2340 sq.ft.)
Note: The Super Area of the apartment as mentioned above is based on concept plans. Certain variations
are expected during the process of design & development from concept stage to Good for construction
stage. Final area will be recomputed based on “As Built” plans
UNIT ‐1
12
25‐Dec‐13 The Castille ‐ III
UNIT PLAN (CONCEPT)
3BHK+SERVANT – 217.40 sq.mtr (2340 sq.ft.)
Note: The Super Area of the apartment as mentioned above is based on concept plans. Certain variations
are expected during the process of design & development from concept stage to Good for construction
stage. Final area will be recomputed based on “As Built” plans
UNIT ‐2
13
25‐Dec‐13 The Castille ‐ III
3BHK RESERVE PARKING SLOT PLAN (CONCEPT) (Tower No. 15)
14
25‐Dec‐13 The Castille ‐ III
SPECIFICATIONS
INTERIORS :
Living, Dining • Marble Flooring and Skirting
Bedrooms,
Family Lounge
• Marble Flooring and Skirting
• 7‘high wardrobes in pre‐laminated particle board in dress areas of
bedrooms.
Bathrooms,
Powder Room
• Ceramic tile flooring and dado 7’ high in shower area and 3’ high in rest of
the area.
• Shower cubicle in master bathroom
• Jacuzzi in master bathroom.
• High quality fittings & fixtures of Kohler, Grohe or equivalent
• Toilet accessories: paper holder, door hooks and towel rods.
• Heated mirrors for defogging in master bathroom.
Kitchen/Utility
• Ceramic tile flooring
• Ceramic tiles dado up to 2’ height above counter and 7’ ht in all exposed
areas.
• Granite counter top.
• Modular kitchen with Stainless Steel Sink.
Wall Treatments • Acrylic emulsion/ Texture paint over POP on wall and ceiling.
Doors and
Windows
External:
• Aluminum glazed doors & Windows.
Internal:
• Teak wood paneled doors.
Balconies • Anti‐skid Ceramic Tiles flooring and skirting.
Worker Room
• Ceramic Tile flooring and skirting.
• Dry distemper on plastered walls.
• Door with Flush shutter.
Worker Toilet • Ceramic tile flooring and dado.
Air Conditioning • VRF air‐conditioning with heat & cold options.
Water Supply • Pressurized water supply system
Electrical • First Quality electrical wiring with modular switches and ELCB controls on
all circuits without light fixtures.
Fire Security • Fire alarm system
15
25‐Dec‐13 The Castille ‐ III
Communication • Provision for FTTH for data services (IP TV, Broad Band & Wi‐Fi) and cable
TV/DTH.
Security
• Access control cards for the building.
• CCTV in entrance lobby.
• Video door phone.
COMMON AREAS :
Lobby • Stones in flooring and Skirting.
• Acrylic emulsion/ Texture paint on walls.
Other Facilities • Reserved Car Parking Slots at Stilt Level
Complimentary Life Time Golf Membership*.
EXTERIORS
Finishes • Combination of Stone Cladding and Exterior Grade Texture Paint.
*The Entrance Fees is complimentary. No Security Deposit. Subscription Fees is as applicable
and 6‐months subscription fees have to be paid in advance at the time of possession.
16
25‐Dec‐13 The Castille ‐ III
PRICE LIST
S. NO. TOWER NO. FLOOR NO. UNIT
SALEABLE AREA NO. OF
RESERVED
CAR
PARKING
SLOTS
RESERVED
CAR
PARKING
SLOT NO.
TOTAL SALE
PRICE (Rs.)
In Sq.M In Sq.Ft
PHASE ‐ I
1
TOWER‐14
(4‐BHK)
1st
FLOOR
CAS‐14‐
001
4 BHK+SQ 292.64 3150 2 101 29,610,000
2
CAS‐14‐
002
4 BHK+SQ 292.64 3150 2 102 29,610,000
3
2nd
FLOOR
CAS‐14‐
101
4 BHK+SQ 292.64 3150 2 201 29,610,000
4
CAS‐14‐
102
4 BHK+SQ 292.64 3150 2 202 29,610,000
5
3rd
FLOOR
CAS‐14‐
201
4 BHK+SQ 292.64 3150 3 301 30,476,250
6
CAS‐14‐
202
4 BHK+SQ 292.64 3150 3 302 30,476,250
7
4th
FLOOR
CAS‐14‐
301
4 BHK+SQ 292.64 3150 3 401 30,476,250
8
CAS‐14‐
302
4 BHK+SQ 292.64 3150 3 402 30,476,250
9
TOWER‐15
(3‐BHK)
1st
FLOOR
CAS‐15‐
001
3 BHK+SQ 217.40 2340 2 101 22,276,800
10
CAS‐15‐
002
3 BHK+SQ 217.40 2340 2 102 22,276,800
11
2nd
FLOOR
CAS‐15‐
101
3 BHK+SQ 217.40 2340 2 201 22,276,800
12
CAS‐15‐
102
3 BHK+SQ 217.40 2340 2 202 22,276,800
13
3rd
FLOOR
CAS‐15‐
201
3 BHK+SQ 217.40 2340 2 301 22,510,800
14
CAS‐15‐
202
3 BHK+SQ 217.40 2340 2 302 22,510,800
15
4th
FLOOR
CAS‐15‐
301
3 BHK+SQ 217.40 2340 3 401 23,049,000
16
CAS‐15‐
302
3 BHK+SQ 217.40 2340 3 402 23,049,000
17
TOWER‐16
(4‐BHK)
1st
FLOOR
CAS‐16‐
001
4 BHK+SQ 292.64 3150 2 101 29,610,000
18
CAS‐16‐
002
4 BHK+SQ 292.64 3150 2 102 29,610,000
19
2nd
FLOOR
CAS‐16‐
101
4 BHK+SQ 292.64 3150 2 201 29,610,000
20
CAS‐16‐
102
4 BHK+SQ 292.64 3150 2 202 29,610,000
21
3rd
FLOOR
CAS‐16‐
201
4 BHK+SQ 292.64 3150 3 301 30,476,250
22
CAS‐16‐
202
4 BHK+SQ 292.64 3150 3 302 30,476,250
23
4th
FLOOR
CAS‐16‐
301
4 BHK+SQ 292.64 3150 3 401 30,476,250
24
CAS‐16‐
302
4 BHK+SQ 292.64 3150 3 402 30,476,250
(Additional Service Tax, as applicable)
17
25‐Dec‐13 The Castille ‐ III
Notes:
1. The above pricing is for the indicated super area and is inclusive of all the extra charges
except for one time Interest Free Maintenance Deposit (IFMD) & Maintenance Advance for 1
Year.
2. Car parking slots are reserved for each apartment at the stilt level as indicated in the price
list.
3. Stamp Duty, Registration Charges, and legal / miscellaneous expenses etc., shall be payable
by the Allottee at the time of offer of possession.
4. Maintenance charges as per maintenance agreement shall be payable by the allottee
separately.
a. Estimated Maintenance Advance for 1 year, @ Rs. 388/‐ psm( Rs. 36/‐ psf), shall be
payable extra before handing over possession of the premises to the allottee.
b. One time Interest Free Maintenance Deposit ‐ Refundable (IFMD) @ Rs. 808/‐ psm(
Rs. 75/‐ psf), shall be payable extra at the time of offer of possession.
5. The actual maintenance charges shall be based on the actual cost by the concerned
maintenance agency.
6. Areas are indicative only.
7. Exact super area of Apartment shall be calculated based on “As‐Built” plans at the time of
handing over possession of property as constructed. Increased / decreased area shall be
charged proportionately as per the sale price.
8. The super area means the covered area of the demised premises inclusive of the area under
the periphery walls, area under columns and walls within the demised premises, half of the
area of the wall common with the other premises adjoining the demised premises,
cupboards, AC ledges, plumbing / electric shafts of the demised premises, total area of the
balconies and terraces, and proportionate share of the common areas like common lobbies,
lifts, common service shafts, staircases, machine room, mumty ,water tank ,electric substation
,area under other services and architectural features and other common areas etc.
9. The other terms and conditions shall be as per the Application Form and the Allotment Letter
of the Company.
10. The transfer charges/ administrative charges are @Rs. 2153/‐ psm (Rs. 200 psf). Transfer of
provisional allotment to be permitted only after receipt of 30% payment (subject to change
as per company policy).
11. The prices are subject to revision / withdrawal at any time without notice at the sole
discretion of the Company.
12. Government Taxes as applicable from time to time shall be payable by the allottee in
addition to the sale price as stated above.
18
25‐Dec‐13 The Castille ‐ III
PAYMENT PLANS
A. Construction Linked Plan
S.No Payment Due
Percentage (%) of
Sale price (SP)
Other Charges
1 On Booking along with application form As applicable*
2 On or Before 2 months from the date of PAL
20% of SP –
Booking Amount*
3 On or Before 4 months from the date of PAL 10% of SP
4 On commencement of foundation 10% of SP
5 On completion of foundation 10% of SP
6 On laying of ground floor roof slab 9 % of SP
7 On laying of 1st floor roof slab 9 % of SP
8 On laying of 2nd floor roof slab 9 % of SP
9 On laying of 3rd floor roof slab 9 % of SP
10
On completion of internal plaster within the
apartment 9 % of SP
11 On offer of Possession of the apartment
5% of SP
Maintenance
Advance + IFMD
Total 100%
Notes:
1. Installments under S. No. 1‐3 may run concurrently with those under S. No. 4‐10 based on
the physical progress of Work at site.
2. The demand letter for Installments at S. No. 4 to 10 shall be sent in advance providing for
Payment period of up to 15 days.
B. Down Payment Plan
S. No Payment Due
Percentage (%) of
Sale price (SP)
Other Charges
1 On Booking along with application form As applicable*
2 On or before 1 month from date of PAL
95% of SP –
Booking Amount*
3 On offer of possession of the apartment
5% of SP
Maintenance Advance +
IFMD
TOTAL 100%
Note: Down payment discount upto 9% of BSP based on the stage of construction at the time of
issuance of PAL
*Booking Amount:
S.No Unit Type Booking Amount (Rs. In lacs)
1 3 BHK + Servant 24
2 4 BHK + Servant 32
Cheques & Demand Drafts should be drawn in favor of “Jaypee Greens (A Division of Jaiprakash
Associates Limited)”
19
25‐Dec‐13 The Castille ‐ III
FREQUENTLY ASKED QUESTIONS
What are the location details?
􀂾 Jaypee Greens is located in the heart of Greater Noida, thereby enjoying good connectivity
and locational advantage with respect to the city master plan.
􀂾 25 min (approx.) from New Friends Colony via the Delhi‐Noida‐Delhi Expressway
􀂾 35 min (approx) from South Extension
􀂾 50 min (approx.) from Vasant Vihar
􀂾 50 min (approx.) from Connaught Place
What kind of security would be provided?
􀂾 It would offer multi‐tier security system with manned security at the periphery of the
complex and Access Control systems.
What is the provision for water & power back up?
􀂾 24x7 water & power back up shall be provided.
What is the status of ownership of land pertaining to this project?
􀂾 Greater Noida Industrial Development Authority (GNIDA) has leased a total of about
452.26 acres of land to M/s Mussorie Hotels Ltd. (now known as M/s Jaiprakash Associates
Ltd.) vide three Lease Deeds dated 8th June 2000, 8th June 2000 and 18 May 2001
respectively. Out of the aforesaid 452.26 acres of land. 193.86 acres of land is being
utilized for Golf Course (including related amenities), 116.63 acres of land for Integrated
Sports Complex (including related amenities) and 60 acres of land for the purpose of a
Park. The balance 81.77 acres of land is being utilized for residential and commercial
purposes. Castille‐III Apartments are proposed to be constructed on a part of the aforesaid
land earmarked for residential and commercial purposes.
Have the Layout Plan/Building Plan for the project being approved?
􀂾 The Layout Plan pertaining to this part of Jaypee Greens, Greater Noida, have been
approved by GNIDA vide its letter No. PLG(BP)907/Rec/QPA‐5578 dated 14.8.2012 . The
building plan for Castille‐III apartments have already been submitted to GNIDA for
approval.
Where are the proposed Castille‐III Apartments located within Jaypee Greens Colony
􀂾 Miniature Layout Plan of Overall Jaypee Greens Colony is attached indicating the location
of proposed Castille –III Apartments.
20
25‐Dec‐13 The Castille ‐ III
Who will maintain the common area? Do I pay anything upfront towards common area
charges?
􀂾 The common areas/services which are to be shared by the said apartments with other
users within Jaypee Greens, shall be maintained by a designated Maintenance Agency on
payment of maintenance charges.
􀂾 The one time Interest Free Maintenance Deposit (Refundable) is payable upon offer of
possession of the Demised Premise.
􀂾 Estimated Maintenance charges for 12 months shall have to be paid in advance upon offer
of possession of the apartment.
What are the stamp duty charges?
􀂾 At present, it is 5% of consideration or the value of the property (whichever is higher) at
the time of conveyance deed, as per applicable stamp duty act.
What steps are being taken to make the city eco‐friendly?
􀂾 Special care will be taken to preserve the environment & make the entire city eco‐friendly.
As far as possible & feasible, local materials will be used for construction purpose, fresh
water will be conserved and gray water would be recycled & energy to be produced locally
by means of eco friendly systems. Open spaces to be provided preserving natural
environment, eco‐retreats & hosting eco‐activities. Several other steps will be taken such
as recycling solid waste, protection of natural flora & fauna, use of indigenous plants in the
city, walking & cycling to be encouraged.
PAYMENT RELATED QUERIES
Is the price escalation free?
􀂾 Yes subject to the standard terms and conditions, the contracted price would be escalation
free.
What are the various payment plans available?
􀂾 Following Payment plans are being offered:‐
1. Construction Linked Payment Plan
2. Down Payment Plan
What if there is a delay in payment on due date? Is any interest levied for the same?
􀂾 All installments are payable by the due date. Any delay in payment beyond the due date
will attract an interest @ 12 % p.a. on the delayed amount for the delay period. However any
payment made ahead of “due date” shall entitle you to earn Early Payment Discount (EPD) @
12% p.a.
21
25‐Dec‐13 The Castille ‐ III
How is EPD adjusted?
􀂾 The EPD earned shall be adjusted in the next due payment.
Is there any compensation or price rebate given to the customer, if there is a delay in
possession of the said premises?
􀂾 Yes, the customer is entitled for price rebate of @Rs.108 per Sq.m (Rs.10 per Sq.ft.) of the
super area per month of the delayed period. (As per the terms and conditions mentioned
in the application form)
Can I request for cancellation of allotment at a subsequent date? What are the financial
consequences of the same?
􀂾 In case the booking of any unit is cancelled on the request of the customer or otherwise,
the following procedure shall be followed:
i) Cases where PAL has not been issued:
Booking amount shall be refunded, without any deduction.
ii) Cases where PAL has been issued
If the request for cancellation is received:
a) Within 30 days from the date of PAL ‐ No deduction will be made and 100% of the
amount received will be refunded.
b) After 1 month from the date of PAL ‐ 10% of the consideration being earnest money
will be deducted, and the balance will be refunded to the customer.
No interest shall be payable to the customer on the amount paid by him in any of the
above cases.
22
25‐Dec‐13 The Castille ‐ III
Jaypee Greens, Sales & Marketing Office, G‐Block, Surajpur Kasna Road,
Greater Noida – 201 306 (U.P.)
Ph: +91 (0120) 2326533. Fax: +91 (0120) 2320454
Toll Free: 1800 ‐ 180 ‐ 9900
This info – pack is conceptual and not a legal offer and gives only a bird’s eye view of the project. The content in this info – pack, including the plans,
elevations, images, floor plans, location details, areas, designs, layouts, specifications and payment plan etc. are tentative and are merely indicative
in nature and are subject to variations and modifications at the sole discretion of the competent, statutory authorities or the company.
1 Sq. m = 10.764 Sq. ft

Piramal Mahalaxmi Mumbai Call 9958959555 for details of upcoming Mahalaxmi Project Mumbai by Piramal Realty

Piramal Mahalaxmi Mumbai March 30, 2018 Piramal Mahalaxmi Mumbai A New Residential Property Project By The Most Reputed Real Estate...